- Product Description
F-5 Fluorine Tester
Operation method of fluorine measuring instrument/fluorine element analyzer:
1. Instrument connection Connect the inlet of the distillation flask to the upper mouth of the rotameter with a silicone tube, connect the outlet of the distillation flask to the inlet of the distillation tube with a silicone tube, and connect the outlet of the distillation tube to the upper mouth of the condenser tube with a silicone tube to connect. the water nozzle is connected to the outlet of the cooling water pump, the lower end of the condenser tube is connected to the water nozzle, and the upper end of the condenser tube is connected to the water outlet. Take out the steam heater, connect the heater power cord, first insert the capillary temperature sensor into the rubber stopper, and then put the heater into the distillation flask. Take out the long rod thermostat sensor, connect the sensor to the instrument sensor interface and put it in the electric furnace insulation cover. At this point, the instrument is connected.
2. Instrument debugging: Add 900 mL of water to the distillation flask to close the heater rubber stopper, put 5 mL of distillate into the quartz distillation tube, and connect all the silicone tube connections.
3. Turning on Before turning on the machine, first check whether there is cooling water outside, insert the power plug of the instrument into the socket, turn on the power switch, turn on the cooling water, and observe whether the condensate tube is full of condensate and should return to the water tank. Set the temperature controlled by the thermostat to 250℃, turn on the heating switch and the air pump switch, and adjust the temperature knob clockwise to set the temperature switch at 110℃. After the water in the distillation flask boils, adjust the temperature knob counterclockwise to keep the water around 85℃. Yes, adjust the gas flow meter, control the gas flow rate to 100 ─ 150 mL/min, and distill 2 minutes After the clock, observe whether there is distillate dripping out of the condenser tube. If there is, it is normal. If not, please check whether the pipeline is well connected and the heater power supply is well connected.
4. Shutdown The shutdown sequence is: turn off the heating─turn off the air pump─turn off the cooling water pump─turn off the power supply─unplug the power plug─end.
fluorine element analyzer Maintenance of fluorine meter:
1. Lubrication should be carried out according to the specified lubrication parts and lubrication methods before starting the machine.
2. Disassembly and assembly by professionals who understand the structure of the testing machine.
3. When the testing machine is out of service for a long time, it should be coated with anti-rust oil on the working surface and stored in a dry place.
4. Keep the testing machine clean.
Hot Products
Contact us
Please feel free to give your inquiry in the form below We will reply you in 24 hours